Home › Guide › Stage 6: In contract: escrow to closing
Inspections During Escrow in SF: What to Do With the Findings
Updated 2026-10-24, 7 minute read
If you kept an inspection contingency in San Francisco, you probably have between three and ten days, and the seller has already handed you their own reports. Your job is to verify what the disclosure package says, open what the seller's inspector did not, price what you find, and decide credit, repair or walk before the deadline.
A day-by-day plan
The California contract defaults to 17 days. Bay Area agents describe 7 to 10 as the negotiated norm, and in SF many accepted offers carry 3 to 5 days or none. The clock runs in calendar days from acceptance; on the C.A.R. form a deadline landing on a weekend or holiday rolls to the next business day.
| Day | Do this |
|---|---|
| 0 (acceptance) | Reread every seller report and the 3R. List what was "not accessible," "not entered" or recommended for further evaluation. Call the general inspector, a sewer scope operator and any specialist the list points to. Request HOA documents through escrow if they were not in the package. |
| 1 to 2 | General inspection, sewer scope, pest re-walk if access allows. Attend all of them. |
| 2 to 4 | Specialist visits (engineer, roofer, electrician, chimney). Request contractor bids on anything over a few thousand dollars. |
| 4 to 6 | Reports back. Decide: accept, request credit or repairs, or cancel. Send any request in writing. |
| 6 to 8 | Seller responds. Counter once if needed. |
| Last day | Remove the contingency in writing or cancel. Do not let it lapse silently. |
On a three-day window: inspections day one, specialists day two, decision day three, which only works if your inspectors and specialists were lined up before you wrote the offer.
The general inspection
Go. Walk with the inspector and ask three questions in every room: what is this, how serious, what does fixing it involve. An SF inspector who knows pre-1950 construction will spend their time at the foundation, the garage ceiling, the rear stairs and decks, the roof, the electrical panel and wherever water has been.
Read the report as triage, not a verdict. Sort the items into safety and structure (foundation movement, active leaks, unsafe wiring, gas), big-ticket systems near end of life (roof, water heater, furnace, drainage), and the long tail of maintenance you will do over ten years. Only the first two categories are negotiation material.
Pest report: Section 1, Section 2 and clearance
A California wood-destroying pest report separates Section 1 (active infestation, infection or damage: termites, dry rot, fungus) from Section 2 (conditions likely to lead to it, with no damage yet). The Section 1 total is what everyone negotiates around, and in SF it is usually dry rot at decks, rear stairs, window sills and bathroom subfloors rather than termites.
The bid printed on the report is one contractor's number; repair bids for identical findings vary far more than inspection fees, so get a second bid on anything significant. A "Section 1 clearance" certifies the Section 1 work was completed; some government-backed loans want it, conventional lenders generally do not, and it is your proof the work was done if you negotiate a repair.
Sewer lateral scope
Much of SF still drains through original clay or cast-iron laterals. The SFPUC's rule: the lateral belongs to the owner, who is responsible for the upper section from the building to the curb; under most circumstances the SFPUC repairs or replaces the lower section from curb to main when it has a structural defect, usually at no cost to the owner, so confirm with the SFPUC before paying for street work. There is no sale-triggered inspection certificate in SF the way the East Bay has, so nobody checks this line unless you do.
Normal findings on a 100-year-old pipe: minor root intrusion, small offsets at joints, scale in cast iron. Findings that cost real money: a collapsed section, a belly holding standing water, roots filling the pipe, or a break under the sidewalk or street. Other Bay Area agencies have published older replacement estimates of roughly $4,000 to $11,000 (as of 2026-10-25, check current figures); SF bids for deep or long runs are often higher and into five figures, so get two bids rather than trusting any average.
Foundation, drainage and seismic findings
Escalate to a licensed structural engineer when the inspector flags a brick or unreinforced foundation, cripple walls taller than about four feet, a house on a steep slope, a soft-story ground floor, a retaining wall holding back a hillside, or settlement signs such as sloping floors and doors that will not latch. Pay for an engineer's flat-fee visit and letter rather than a contractor's free estimate; the contractor wants the job. The engineer tells you whether you are looking at a retrofit measured in thousands or a foundation replacement measured in six figures, and that difference is your whole negotiation. SF red flags covers what each of these conditions means.
Condo buyers: the HOA review runs in the same window
Under Civil Code 4525 the seller must deliver the governing documents, current budget, reserve funding summary, insurance information, minutes and any notices of assessment or litigation, and the association must produce them within 10 days of the request. The standard California contract gives you until the end of your contingency or five days after delivery, whichever is later; the SFAR contract has its own language, so check it.
Three things to do in parallel with the physical inspections:
- Read twelve months of minutes for the words leak, litigation, special assessment, reserve study and insurance.
- Get the master insurance policy declarations and the renewal date. Associations across California have faced non-renewals and premium jumps; a master policy that renews next month at double the premium lands in your dues.
- Ask your lender on day one to send the condo questionnaire to the management company, and ask the listing agent who at the HOA answers it. Lender bulletins describe a broader Fannie Mae full-review requirement for applications dated August 3, 2026 or later; confirm with your lender which review applies, because a slow questionnaire is a leading cause of late closings. HOA documents explains what the numbers should look like.
Request for repairs, credit or price reduction
You can ask for any of the three. What SF sellers typically accept, in rough order of likelihood:
- A credit toward your closing costs for a genuine surprise the disclosures did not cover. This is the cleanest ask; nobody has to coordinate contractors before closing.
- A price reduction when the credit you need exceeds the lender's cap on seller contributions: 3% of price with less than 10% down, 6% with 10% to 25% down, 9% above 25% down on a conventional loan, and never more than your actual closing costs.
- Seller-performed repairs, which sellers resist because the work and the warranty become their problem. If you go this way, specify licensed contractors, permits where required, and a re-inspection before close.
Sellers usually refuse anything that was visible in their own reports: if the package's pest report said $18,000 of Section 1 and you offered anyway, asking for it back reads as a renegotiation, and a seller with a backup offer will decline. Before you ask, test the adjusted price against closed sales in the comps tool so you know whether the home is still fairly priced with the repair cost deducted, and read contingencies for how the removal mechanics work.
Remove, hold back, or walk
Remove the contingency in writing only when you have the answers you need and any agreed credit or repair is in a signed addendum. If a repair cannot be finished before closing, ask escrow for a holdback: a sum held from the seller's proceeds and released when the work is verified. If you are walking, cancel in writing before the deadline and request release of your deposit; a clean cancellation inside the contingency gets it back.
Keep everything: reports, photos, bids, the seller's responses; if an undisclosed problem surfaces after closing, that file shows what the seller knew.
What to shop for right now
Two medium-savings items. A general inspector, if you did not inspect pre-offer: fees cluster around $500 to $850 in the Bay Area, so the saving from shopping is a couple hundred dollars at most; what you are really shopping for is next-day availability and a report specific enough to negotiate from. Specialists: ask for a flat diagnostic fee from someone who does not want the repair job (a scope-only operator, an engineer rather than a foundation contractor), then collect two bids on anything you will negotiate over. The spread between repair bids is where the money is.
Shop for this now
| Service | When | Savings from shopping | How to shop it |
|---|---|---|---|
| Home inspector | Day one of escrow if you did not inspect before offering | Medium: worth 2-3 quotes Bay Area standard inspections cluster around $500 to $850 as of 2026-10-24, so shopping saves perhaps $100 to $200; availability and report quality are worth more than the fee gap on a five-day window. | Call two or three inspectors the day your offer is accepted, ask for next-day or weekend availability, the fee for your square footage and year built, and a sample report on a pre-1920 SF home; book the one who can show up and whose reports are specific. |
| Specialist follow-up inspections (sewer, foundation, roof, electrical, chimney) | Days one to three of the contingency, booked alongside the general inspection | Medium: worth 2-3 quotes A camera scope runs about $250 to $500 and chimney or roof add-ons about $100 to $400 per national cost guides as of 2026-10-24; repair bids for the same finding routinely differ by thousands, which is where comparison pays. | Ask for a flat diagnostic fee from a vendor who does not want the repair job, then get two contractor bids for anything you will negotiate over. Insist on the video file for a sewer scope and a written letter from an engineer. |
Frequently asked questions
Can I ask for repairs after inspection in California?
Yes, if you kept an inspection contingency. The California contract lets you request repairs, a credit or a price change in writing during the contingency period, but the seller has no obligation to agree; your only guaranteed remedy is to cancel and get your deposit back before the contingency expires. If you waived the contingency, which is common in SF, you can still ask, but you have no cancellation right if the seller says no.
Should I ask for a credit or a price reduction?
Usually a credit toward closing costs, because it puts cash in your pocket at closing rather than lowering your loan slightly. The catch is that lenders cap seller credits: on a conventional loan the limit is 3% of price with less than 10% down, 6% with 10% to 25% down and 9% with more than 25% down, and the credit cannot exceed your actual closing costs. If the repair number is larger than that, take the rest as a price reduction or have the seller do the work.
How long is the inspection contingency in San Francisco?
The California form defaults to 17 days, but Bay Area agents describe negotiated windows of 7 to 10 days as the norm, and in San Francisco many winning offers carry 3 to 5 days or none, because the seller already supplied inspection reports in the disclosure package. Whatever your number, it runs in calendar days from acceptance; on the C.A.R. form a deadline that lands on a weekend or holiday rolls to the next business day, so check how your contract counts.
How much does it cost to replace a sewer lateral in San Francisco?
As of 2026-10-24 there is no reliable published San Francisco average. Other Bay Area agencies have published older replacement estimates of roughly $4,000 to $11,000 for a typical lateral (as of 2026-10-25, check current figures), and San Francisco bids for a long or deep run under a sidewalk, or one needing street work, are frequently higher and into five figures. In SF the owner is responsible for the lateral from the building to the curb, and the SFPUC generally handles the section from curb to main. Get two bids before you negotiate.
What if the seller refuses to make repairs?
You have three choices before the contingency expires: accept the home as is, counter with a smaller ask, or cancel and recover your deposit. SF sellers in multiple-offer situations often refuse anything beyond a modest credit for a genuine surprise, so decide in advance what finding is big enough to walk over. Once you remove the contingency in writing, refusing to close over the same issue can put your deposit at risk.
How long do I have to review HOA documents in escrow?
Under California Civil Code 4525 the seller must provide the HOA's governing documents, budget, reserve summary, insurance information and minutes, and the association must deliver them within 10 days of the request. The standard California contract gives you until the end of your general contingency period or five days after you receive them, whichever is later, to review and object; the SFAR contract used in the city has its own wording, so read yours.
Sources
- Seb Frey: Inspection contingency in Bay Area home purchases
- Fannie Mae Selling Guide B3-4.1-02: Interested Party Contributions (IPCs)
- California Civil Code section 4525: Documents a seller must provide to a prospective purchaser
- California Civil Code section 4530: Association must provide documents within 10 days
- Davis-Stirling.com: Escrow documents and transfer fees (Civil Code 4525)
- SFPUC: How to take care of your sewer lateral
- SFPUC: Sewer repair (upper and lower lateral responsibility)
- Union Sanitary District: Sewer lateral information for homeowners (2016 handout with replacement cost ranges)
- California Structural Pest Control Board: Consumer information on wood-destroying pest inspection reports
- Inspect and Test: Average house inspection cost, 2026 benchmarks (regional ranges)
- Applied Technology Council: Earthquake strengthening of cripple walls (recovery advisory)
- Fannie Mae Selling Guide B4-2.2-02: Full Review Process (condo projects)
- Fannie Mae Selling Guide B4-2.1-01: General information on project standards
- Homebridge Wholesale: Condo project review questionnaire (rev. 7/1/26) describing Fannie Mae review changes
- Coverage Cat: Condo associations facing insurance hikes in California